Description

Brand new mechanical structure

Anti-slip design

classic logo design

(dismantling diagram)

1.body top cover
2.Replaceable slot board
3.Paragraph Balls
4.GGuide Ball Shaft Lock
5.guide ball
6.support spring
7.main body tray
8.bottom bearing
9.damping ring
10.Bottom locking screw

Installation order
1. Install part 5 (guide ball) to the corresponding position of 7 (main body tray)
2. Use 4 (GGuide Ball Shaft Lock) to lock 5 (guide ball) already installed on 7 (main body tray)
3. Install 6 (support spring) in the spring mounting hole of 7 (main body tray), then put 3 (Paragraph Balls) on the spring
4. Install 2 (Replaceable slot board) in 1 (body top cover)
5. Install 8 (bottom bearing) in the bearing hole of 7 (main body tray)
6. Install the 10 (Bottom locking screw) in the 8 (bottom bearing) hole
7. Assemble the main body top cover kit and main body kit, press 10 (Bottom locking screw) and rotate clockwise to complete the installation
Size Specifications
33.5MM*8.1MM
Packaging List:
Product body*1
EDC Portable Box*1
some stickers
Several accessories
Shipping
After placing the order, we usually ship within 1-5 days. (Except customized or pre-ordered products) Our basic logistics providers are: 4PX, yuntu, EC-Firstclass. (Use the best logistics company among the three logistics companies according to the customer's area) It is expected to arrive in about 6-20 days after delivery.
When the above three companies are unable to provide services, we will contact customers and switch to logistics companies such as FedEx, DHL, TNT, and ups.
Recommended logistics information query website: www.17track.net/